VOLTAGE acted as the General Contractor (EPC contractor) in the implementation of the 5.5 MW peak solar power plant construction project.

VOLTAGE provided the development of design solutions and the following works:

  • land planning, partial vertical planning and landscaping;

  • partial movement of earth masses;

  • provision of quality materials and equipment;

  • arrangement of an external protection;

  • execution of construction and installation works;

  • arrangement of electrical and other related engineering networks on the territory of the station;

  • arrangement of internal electric networks for delivery of power of power plant in a network, and also food of own needs of SES;

  • delivery and installation of complete transformer substations (KTP-0,4 / 10 kV);

  • construction of an administrative and household complex with appropriate infrastructure;

  • installation of a monitoring system;

  • commissioning works;

  • registration of documents for submission to the National Commission for Regulation of Economic Competition (obtaining a license and establishing a "green" tariff)

Number of installed solar panels: 20456 pcs. unit power of 270 watts.

Number of installed inverters: 46 pcs., Model "INGECON SUN 100 TL" with a capacity of 100 kW.

 

The construction period was 5 months. After completion of all construction and installation works, as well as the commissioning of this facility, VOLTAGE provides operation and maintenance of this SES.

 

Location of the object: Vinnytsia region, Bershad district, village Velyka Kyryivka

Customer: ELECTROSOLAR LLC. 

Date of project implementation: 2018 - 2019